From the more-of-the-same department another weekend of minor accomplishments. The weather wasn't up to much, so it was inside jobs only. The river was running fast and for a few hours rose by about a foot, which made getting off or on tricky.
One job I was keen to do was to get some paint on the rear door, as this was just bare wood and a winter in the elements wasn't going to help it. The door was able to be painted inside which was good, I still need to paint the topcoat of maroon on the bottom section, but it doesn't look to bad as it is, at night.

We had a new bed arrive during the week, so I assembled it in time for Mary to get the flu. This meant that Mary spent most of the weekend skiving tucked up warm watching chick flicks.

I did manage to do some electrical stuff, I placed most of the main components on the board in the 'electric space' where the old ballast tank used to be.

Mary was impressed by the bauhaus-like layout, i didn;t tell her that it'll be the cabling up thats the tricky bit.
I also installed the first of my old ships lights that I collected last winter. I may well have purchased too many of these, but ebay can take them back if we don't needed.

Just need to get the permanent wiring to it now.